We handle pool construction from prefabrication to on-site assembly under expert supervision. Every detail is controlled for structural accuracy, clean welding, and fast delivery.
Pool Construction Process

We build stainless steel pools from prefabricated sections, manufactured in-house and assembled on site. From delivery through water testing, each stage is managed by ProGorki engineers with local crews.
Prefabricated precision. On-site execution
• Pool sections production and QA
• Delivery logistics and pre-install checks
• Modular assembly and frame welding
• Liner installation and sealing
• System hookup and water testing
• Final inspection and handover
How to Install a Stainless Steel Pool
Step-by-step pool installation
1. Pool site preparation and foundation check
2. Section delivery and alignment
3. Frame connection and structural assembly
4. Liner installation and surface sealing
5. System hookup and hydraulic testing
6. Final inspection and handover
Real-world Pool Construction
Photos from site installations and build phases — during and after installation.


POOL INSTALLATION SCOPE
WE PROVIDE
Our team manages all stages of pool installation — directly or in coordination with general contractors and MEP teams.
- On-site supervision during welding and assembly
- Coordination with civils and foundation work
- Pre-commissioning and functional testing
- CE and ADA compliance documentation
- Handover package with as-built drawings
Optional Pool Systems & Features
Need more than just a pool?
*Each add-on is pre-integrated into the build phase to reduce downtime and avoid retrofits.

Talk to an Engineer
Designing a new aquatic center or upgrading a facility —we are ready to assist.
Get Technical Drawings →
Talk to an Engineer
Planning to install a stainless steel pool?
We’ll help you scope the installation, timeline, and requirements for your facility.
