Prefabricated stainless steel pools — engineered for clinical, commercial, and wellness use. Built for spa installations, rehabilitation centers, and medical facilities. All systems are CE-ready and support ADA-compliant access.


AISI 316 Frame. PVC Liner. Concrete Base
Modular Pool: Section-Based Steel Construction
Modular pools from ProGorki are pre-engineered systems built section by section.
Each panel is laser-cut, bolted on site, and welded at key junctions.
The shell sits on a leveled slab and is finished with reinforced PVC — no tiles, no grouting, no water loss..


Fully Welded Shells. Flush Hydromassage. Dry Install.
Stainless Steel Spa Design
Each spa pool is welded from AISI 316 or 304 steel, tested in-house, and shipped ready to install. We eliminate wet trades — no curing, tiling, or sealants.
Jets, air injectors, LED lights, and access elements are built into the shell. Just connect and fill.
Fully Welded Shells. Flush Hydromassage. Dry Install.
Spa Pools Stainless Steel Design
Each spa pool is welded from AISI 316 or 304 steel, tested in-house, and shipped ready to install. We eliminate wet trades — no curing, tiling, or sealants.
Jets, air injectors, LED lights, and access elements are built into the shell. Just connect and fill.




Built for Clinics, Recovery, and Continuous Operation.
Rehabilitation Pools with Adjustable Floor
These rehab pools include an integrated movable floor — programmable for different depths.
No coatings. No cavities.
The stainless steel structure handles heat, chlorine, and daily use.
Bikes, treadmills, and assist railings are pre-mounted if needed. CE and ADA compliant.
Modular vs Spa vs Rehab Pools
Compare materials, specs, and installation timelines.
| Feature | Modular Pool | Spa Pool | Rehab Pool |
|---|---|---|---|
| Structure | Bolted AISI 316 Panels | Welded AISI 316 or 304 Shell | AISI 316/304 Shell with Movable Floor |
| Finish | PVC Membrane | Polished Stainless / PVC | Non-Slip Lamellae |
| Depth | Up to 3.0 m | Fixed (0.9–1.3 m) | Variable via Floor Control |
| Hydromassage | Optional | 4–12 Jets | Targeted or Optional |
| Access | Built-in Steps | Grab Rails / ADA Entry | Ramps / Lift / Assist Bars |
| Installation | 3–5 Days | 1–2 Days | 3–5 Days |
| Mounting | On Slab / Flush Deck | Flush to Finished Deck | Flush with Equipment Zones |
| Integration | Filtration + Custom Decking | Lighting, Air, Filtration | Therapy Equipment + Safety Rails |
| Use Case | Hotels, Resorts, Villas | Spa & Wellness Centers | Medical Rehab, Clinics |
| Compliance | CE / ISO | CE / ISO | CE / ADA / ISO |

What you draw is what you get.
From layout to launch. We build pools that match your plan — and your timeline.
Get Technical Drawings →
Talk to an Engineer
What you draw is what you get.
We build pools that match your plan — and your timeline. From layout to launch. Factory-built. Trouble-free.
